System 200 Installation Advice

Hook-On Tiles, Concealed Grid

Notes

Emac hangers should be installed a maximum of 300mm from the end of a run of Emac channel and 300mm from the joint between these channels. Where two J-bars meet and are spliced together, an Emac channel should be installed within 300mm.

For planks longer than 2000mm, the distance between Emac channels should be reduced to 1000mm max.

It is considered good practice to stagger joints in supporting structures.

Additional Loads

When supporting services such as downlights, speakers, detectors and other mechanical and electrical services, the maximum load applied to the ceiling tile must not exceed 7kg including spreader yokes if applicable. The application of a load should always be considered. Please consult the SAS Technical Department for further advice.

For loading for flange formed reinforced apertures, please consult with the SAS technical department.
 

 

System 200 Isometric Drawing Thumb


200 Image 01 Thumb

 

award sponsor

bco-logo2013 (170 x 170)
Pleased to be sponsoring
'Fit out of Workplace' award

world-class interiors

corporate (170 x 104)
Watch our new corporate video or download a copy of the brochure.

find us on

Tweet (30 x 30) linkedin (30 x 30) Fb (30 x 30) youtube (30 x 30) plus-badge

career opportunites

Current career opportunities within SAS

register for updates

Please enter your email address below to register for updates